Comments

Document Feedback - Review and Comment

Step 1 of 4: Comment on Document

How to make a comment?

1. Use this Protected Document to open a comment box for your chosen Section, Part, Heading or clause.

2. Type your feedback into the comments box and then click "save comment" button located in the lower-right of the comment box.

3. Do not open more than one comment box at the same time.

4. When you have finished making comments proceed to the next stage by clicking on the "Continue to Step 2" button at the very bottom of this page.

 

Important Information

During the comment process you are connected to a database. Like internet banking, the session that connects you to the database may time-out due to inactivity. If you do not have JavaScript running you will recieve a message to advise you of the length of time before the time-out. If you have JavaScript enabled, the time-out is lengthy and should not cause difficulty, however you should note the following tips to avoid losing your comments or corrupting your entries:

  1. DO NOT jump between web pages/applications while logging comments.

  2. DO NOT log comments for more than one document at a time. Complete and submit all comments for one document before commenting on another.

  3. DO NOT leave your submission half way through. If you need to take a break, submit your current set of comments. The system will email you a copy of your comments so you can identify where you were up to and add to them later.

  4. DO NOT exit from the interface until you have completed all three stages of the submission process.

 

Quotation Procedure

Section 1 - Introduction

(1) This procedure supports the University's Procurement Policy and outlines the process for the procurement of all goods and services for the University of Newcastle valued up to $150,000 for operational expenditure, up to the threshold value of $250,000 (GST exclusive) for capital and research equipment expenditure. This includes:

  1. capital works for the construction and improvement of facilities;
  2. IT projects and infrastructure;
  3. professional services and independent contractors; and
  4. tangible assets (other than land or buildings) that are used in the operations of research.  Examples include, but are not limited to devices, machines, tools and vehicles.

(2) This procedure should be read in conjunction with the Procurement Policy and the Tender Procedure.

Top of Page

Section 2 - Procedure

Pre-approval of Expenditure

(3) Purchases should be pre-approved by a duly authorised delegate(s) in accordance with the Delegation of Authority Policy.

(4) University  staff members who make purchases or approve expenditure on behalf of the University must do so within an approved source of funds. Any staff member who incurs expenditure beyond or without an approved source of funds is accountable for that expenditure.

(5) For the engagement of professional consultants and independent contractors (regardless of value), a procurement strategy should be considered and developed in conjunction with Procure to Pay and approved by an authorised officer(s).

Quotation Thresholds

(6) A competitive quotation process will be conducted for the procurement of all goods or services valued up to $150,000 (GST exclusive) for operational expenditure, up to the threshold value of $250,000 (GST exclusive) for construction and research equipment expenditure to ensure the University obtains best value for money consistent with the principles outlined in the Procurement Policy.

(7)  NB: Procurement of goods or services cannot be split into parts or instalments to fall below the quotation threshold values. For any goods or services, the specified number and format of quotations is provided as a minimum requirement only. Depending on the nature of the procurement, it may be appropriate to confirm verbal quotations in writing, obtain more than the minimum number of quotations or undertake a tender process.

Operational Expenditure

(8) For goods or services valued less than $5,000 (GST exclusive), No formal process (officer discretion) ensure value for money.

(9) For goods or services valued from $5,000 to less than $50,000 (GST exclusive), at least two written quotations must be obtained. 

(10) For goods or services valued from $50,000 to less than $150,000 (GST exclusive), at least three written quotations must be obtained by sending the University's standard RFQ documentation to potential suppliers using the formal University RFQ process.

Research Equipment Expenditure

(11) For research equipment valued at less than $10,000 (GST exclusive), No formal process (officer discretion) ensure value for money.

(12) For research equipment valued from $10,000 to less than $50,000 (GST exclusive), at least two written quotations must be obtained.

(13) For research equipment valued from $50,000 to less than $250,000 (GST exclusive), at least three written quotations must be obtained by sending the University's standard RFQ documentation to potential suppliers using the formal University RFQ process.

Construction Expenditure

(14) For goods or services valued less than $10,000 (GST exclusive), No formal process (officer discretion) ensure value for money.

(15) For goods or services valued from $10,000 to less than $50,000 (GST exclusive), at least two written quotations must be obtained.

(16) For goods or services valued from $50,000 to less than $250,000 (GST exclusive), at least three written quotations must be obtained by sending the University's standard RFQ documentation to potential suppliers using the formal University RFQ process.

Tender

(17) Any goods or services valued at over $150,000 (GST exclusive) for operational expenditure, up to the threshold value of $250,000 (GST exclusive) for construction and research equipment expenditure, or any procurement which is assessed as presenting a significant risk to the University, must be procured under the Tender Procedure.

Top of Page

Section 3 - Establishment of Supply Relationships

(18) Procurement of some goods or services will be covered by the University's existing supply relationships that are established on a qualified basis. In such instances, quotations must be obtained from these suppliers unless an exemption is granted in accordance with Section 4 below.

(19) Procurement of some goods or services will be covered by an exclusive, University-wide supply agreement. In such instances, additional quotations are not required as the procurement must be obtained from this supplier unless an exemption is granted in accordance with Section 4 below.

Top of Page

Section 4 - Exemptions to Quotation

(20) Certain circumstances may justify or necessitate an exemption to the University's quotation procedures such as:

  1. existing contractual arrangements for the same or similar goods or services;
  2. functional, technical, logistic and/or geographic requirements;
  3. alternative procurement methods offer better value for money and/or lower cost, risk and complexity; and/or
  4. there is a sole supplier in the market.

(21) An exemption to quotation may be approved by the Associate Director, Procure to Pay provided that there is adequate documentation to support the request.

(22) No retrospective exemptions will be approved.

Top of Page

Section 5 - Obtaining Quotations

(23) A detailed specification must be prepared prior to obtaining quotations for goods or services valued at over $50,000. This should be prepared using the University's approved RFQ template and may be issued via the University's electronic RFQ system or finance system.

(24) Information to potential suppliers usually includes:

  1. a description of the goods or services to be procured;
  2. detailed specifications as required;
  3. quantity (units or hours as applicable);
  4. contacts details for the relevant business area;
  5. delivery time or other requirements; and
  6. point of delivery or performance as required.

(25) Quotation documentation must be written such that it does not unduly limit the range of potential suppliers.

(26) In instances when an exemption to quotation has been approved, the functional specification criteria must still be sufficiently detailed to confirm that the quotation meets the University's requirements and offers best value for money.

(27) Quotations should reflect details of freight, installation and any discounts if relevant.

(28) Faxed, mailed, hand-delivered or emailed quotations will be accepted.

Top of Page

Section 6 - Communication During the Quotation Process

(29) Communications during the quotation process will be handled with due regard for probity - all potential suppliers will receive the same information and time for a response, and no single supplier will be given a potentially unfair advantage. This includes clarifications on any aspect of the quotation unless there are reasons relating to confidentiality or intellectual property.

Top of Page

Section 7 - Negotiations During the Quotation Process

(30) Negotiations will be undertaken to achieve an agreement that is fair, durable, meets the needs of both parties and maintains or improves the relationship between the parties. The University will not attempt to lower the price by negotiating or trading between shortlisted or recommended suppliers. The University will not engage in the practice of bid shopping.

Top of Page

Section 8 - Approval of Recommended Supplier

(31) The University reserves the right to accept a quotation other than the lowest submitted and in such cases the reasons will be clearly documented.

(32) In the event that two quotations are equal, the successful one will be selected by giving preference to a local  contractor over a contractor from outside the region.

Top of Page

Section 9 - Record-keeping

(33) For procurements up to $50,000, details of the quotation process should be recorded against the purchase order in the finance system. All other documentation relating to the procurement should be retained by the relevant business unit for audit purposes.

(34) For procurements valued at over $50,000 (GST exclusive), A Request for Quotation must be raised in the University's Finance System (TechnologyOne).

Top of Page

Section 10 - Advising Suppliers of the Outcome

(35) Unsuccessful suppliers or contractors should be advised of the outcome of the quotation process. If requested, the name of the approved supplier may be released but not any details about the quotation.

Top of Page

Section 11 - Performance of Suppliers

(36) Poor performance on the part of a supplier or contractor should be reported to Procure to Pay.

Top of Page

Section 12 - Complaints Resolution

(37) Any complaints arising from the University's procurement activities will be handled in accordance with the University's Complaint and Grievance Policy and Complaint and Grievance Resolution Procedure.

Top of Page

Section 13 - Audit, Compliance and Review

(38) The implementation of and compliance with this procedure will be periodically audited as part of the University's internal audit cycle.

(39) Failure to comply with the provisions of this procedure and the relevant delegations will be taken very seriously. University staff found to be in breach of this procedure may be subject to disciplinary action.

(40) This procedure will be reviewed by the Chief Financial Officer at least once every three years with advice from the Associate Director, Procure to Pay.